By removing the existing roof coverings back to the structure, they can be replaced with high-quality new materials that bring improved performance and long-lasting protection.
The strip and re-sheet system is used when roofs are generally beyond repair. That includes bigger issues, such as corrosion, failed fixings, and ongoing water ingress, which are no longer manageable. It’s a preferred option for projects where longer warranties, insurance requirements, or compliance standards require a fully renewed roofing system.
Each project begins with a full condition report, with input from building owners and surveyors, to assess the condition, suitability, and load capacity of the supporting structure. From there, we carefully plan the works, using temporary weatherproofing and a safe, phased installation to minimise disruption in live environments.
With full control over the delivery programme, safety, and site risk conditions, progressive delivers the best in strip and re-sheet roofing systems. Durable, weatherproof, and built for long-term reliability.
Explore our planned maintenance packages for commercial and industrial buildings.