Skip to main content Contact us  

GWR St David’s

Exeter, Devon
Main Contractor
Bourne Special Projects
Building Type
Maintenance/Offices
Value
£1.5m
Completion
June 2021

The new 190m depot building, which opened in 2021, runs adjacent to the station so it is very visible to the public. This houses a three-storey block accommodating staff and facilities, opposite platform 6 of St David’s station. Behind this is a three-road maintenance shed. We also built the wash building, a plant room for the wash building, and a plant room for the wash, which includes a green room. This was built using Kingspan multi-groove panel which gives an aesthetic appearance of smaller panels. The design also incorporated a special movement joint to allow for the movement of cranes, which our design team partnered with the architect and engineer to create.


Roof Materials

Kingspan RW Composite Roof Panels, Euroclad 32/100 Trapezoidal Roof Sheets, Sarnafil PVC Single Ply Membrane, Sky Garden Sedum Roof System

Wall Materials

Kingspan RW Composite Wall Panels, Kingspan Micro-Rib Composite Wall Panels, Kingspan Wall Light Panels, Kingspan Evolution Multi-Groove Composite Wall Panels, Kingspan Louvre Composite Wall Panels